Comac C919

From Wikipedia, the free encyclopedia

C919
COMAC B-001A May 2017.jpg
The C919 during its maiden flight on 5 May 2017
Role Narrow-body airliner
National origin China
Manufacturer Commercial Aircraft Corporation of China, Ltd.
Designer Wu Guanghui
First flight 5 May 2017[1]
Introduction 28 May 2023 with China Eastern Airlines[2]
Status In service
Primary user China Eastern Airlines
Produced 2015–present
Number built 10 as of 9 December 2022[3][4]

The Comac C919 is a narrow-body airliner developed by Chinese aircraft manufacturer Comac. The development program was launched in 2008. Production began in December 2011, with the first prototype rolled out on 2 November 2015 and having its maiden flight on 5 May 2017. On 29 September 2022, the C919 received its CAAC type certificate. The first production airframe was delivered to China Eastern Airlines on 9 December 2022 and was put into commercial passenger service on 28 May 2023.

The aircraft, primarily constructed with aluminium alloys, is powered by CFM International LEAP turbofan engines and carries 156 to 168 passengers in a normal operating configuration over up to 5,555 km (3000 nmi).

Naming[edit]

In the model number, the C stands for "Comac".[5] The C also forms an "ABC" parallel situation with Airbus and Boeing.[6]

Development[edit]

Model of the C919 from 2010.

The 2008 program launch initially targeted a maiden flight in 2014.[7] Comac applied for a type certificate for the aircraft from the Civil Aviation Authority of China on 28 October 2010.[8] At that time the company intended to manufacture up to 2,300 aircraft of the type.[9] In June 2011, COMAC and Irish low-cost airline Ryanair signed an agreement to co-operate on the development of the C919.[10] In 2012 Airbus' chief strategist Marwan Lahoud assumed that the aircraft would offer competition to Airbus by 2020.[11]

Preliminary Design[edit]

On 24 November 2011, Comac announced the completion of the joint definition phase, marking the end of the preliminary design phase for the C919, with estimated completion of the detailed design phase in 2012.[12] Production of the first C919 prototype began on 9 December 2011.[13] The C919's aerodynamics were designed with the help of the Tianhe-2 supercomputer.[14] The annual production was targeted at 150 planes by 2020.[15] Canada's Bombardier Aerospace started collaborating in March 2012 on supply chain services, electrical systems, human interface, cockpit, flight training, flight-test support, sales, and marketing.[16]

Prototyping[edit]

Its announced development budget was 58 billion yuan ($9.5 billion) but its actual cost was estimated at well over $20 billion.[17] The first prototype was expected to complete final assembly in 2014 and perform its first flight in 2015;[18] however, delivery was delayed again until 2018 due to technical difficulties and supply issues.[19] At the November 2014 Zhuhai Airshow, it was announced that the first flight would be delayed to 2017.[20] On 2 November 2015, Comac rolled out its first C919 aircraft.[21][22][23]

In May 2018, the development of a composite wing completed in 2012 was revealed years after abandoning it for a metallic one, as static and damage tolerance tests were completed, verifying the structural design and strength before full-size composite wingbox tests.[24] On 12 July, the static test aircraft simulated a 2.5g manoeuvre with a 150% ultimate load, bending the wings at the tips by nearly three metres for three seconds.[25]

US espionage allegations[edit]

According to a report from cybersecurity firm Crowdstrike and a US Justice Department indictment, from 2010 to 2015 the Chinese cyberthreat actor Turbine Panda, linked to the Ministry of State Security’s Jiangsu Bureau, penetrated a number of the C919's foreign components manufacturers including Ametek, Capstone Turbine, GE Aviation, Honeywell, Safran, and others and stole intellectual property and industrial process data with the aim of transitioning component manufacturing to Chinese companies.[26][27][28][29] The report stated that the operations involved both cyber intrusion and theft as well as HUMINT operations, in most cases using a piece of code custom written for this industrial espionage operation.[26][27][28][29]

As of 2019, four people have been arrested in the US as a result of investigations into this economic espionage and theft of trade secrets.[29]

In November 2022, a federal jury in Cincinnati convicted Yanjun Xu, 42, on counts of conspiracy to commit economic espionage, conspiracy to commit trade secret theft, attempted economic espionage and attempted trade secret theft. The US court found that Xu played a key role in a plot to steal trade secrets from western aerospace firms, for the purpose of helping the C919 commercial airliner program. He was sentenced to 20 years in prison.[30]

Flight testing[edit]

The first prototype ground tested

2017[edit]

High-speed taxi tests by the first C919 prototype were completed in April 2017[31] and the first flight took place on 5 May 2017.[32][33] At the time, Comac had a planned test programme of 4,200 flight hours and introduction to service in 2020.[1] It was estimated that this could be delayed into 2021.[34] The European Aviation Safety Agency is intended to validate the Chinese type certificate.[35] The 4,200 hours of testing planned were higher than the 3,000 hours typically required for the Airbus or Boeing narrowbodies, but lower than the 5,000 hours needed for the ARJ21.[36]

Comac had its second prototype ready on 28 July 2017, aiming to fly it within the year for engine, APU, fuel system and extreme weather tests. The flight-test plan included six aircraft.[37] On 28 September, it made its second flight at 10,000 ft (3,000 m), which lasted 2 hours 46 minutes, although it was supposed to last one more hour.[38] The five-month delay between first and second flights, while the second prototype was being ground-tested, was extraordinary: in 2013 the Airbus A350 flew again after five days and in 2015 the troubled Mitsubishi MRJ flew again after eight days.[39]

On 3 November, it made its third flight in 3h 45min, reaching 3,000 m (9,800 ft).[40] It was transferred on 10 November from Shanghai to Xian to continue its flight test program, a 2h 24min, 1,300 km (700 nmi) flight reaching 7,800 m (25,600 ft) and Mach 0.74 (825 km/h; 445 kn).[41]

The second prototype first flight on 17 December 2017

The second prototype made its first flight on 17 December 2017. The flight test program allocated the first three prototypes for aircraft performance and engine and power systems testing, the fourth prototype for avionics and electrical system, and the fifth and sixth prototypes for passenger facilities, including the cabin and information system.[citation needed]

2018[edit]

The delay between first and subsequent flights underlined the program immaturity by maiden flight: flying early at low speed and altitude is possible but faster and higher is limited by aeroelastic flutter needing ground vibration testing and aircraft instrumentation which were not ready in May.[42] Due to flight testing problems, the 2020 introduction previously scheduled was delayed to 2021, for China Eastern Airlines.[43] In February 2018, the first prototype was flying more than once a week.[44]

In June 2018, Aviation Week reported flight-test aircraft grounding for modifications, extending the schedule by three months but maintaining a 2020 certification target. The two prototypes needed their flaps and tailplanes modified, due to delamination of the carbon-fiber reinforced plastic elevators.[45] The third test aircraft was also being modified and maximum-rate pressurization was tested. As three other planes will be available in 2019, Comac maintains first deliveries for 2021.[46]

Comac denied any grounding and highlighted that modifications were part of the flight test process, stating the two first aircraft were flying stability tests and checking systems. The first was calibrated and had its counterweight and trailing cone systems modified while the second had its functions and systems checked. The third was in final assembly with its wing and fuselage joined, cables and systems were being installed for a first flight target by the end of the year.[47] On 12 July, the second prototype flew from Shanghai-Pudong to Dongying Airport in 1h 46min to allow for various meteorological conditions testing.[25] In September, Comac expected to conduct 1,500 test flights for over 2,000 flying hours before the first delivery and planned to fly the third prototype before the end of 2018.[48]

In October 2018, the flight-deck design was re-evaluated to comply with US FAR Part 25.1302, which is not required by CAAC but would be needed for FAA certification in order to sell the aircraft outside China. Developing a Chinese engine to replace the CFM Leap-1C would take at least another 15 years.[49] At that time the two prototypes had flown less than 150 h, averaging less than 5 h per month each. To achieve certification in December 2020 and first delivery in 2021, the planned 4,200 h of flight tests would need 33 hours a month each if the last four prototypes are evenly spaced before year-end-2019. Newest airliner designs like the Airbus A350 needed a 2,600 hour test program, and the Mitsubishi MRJ is expected to need 3,000 h.[50]

On 15 October 2018, ten Chinese nationals, including intelligence officials, were indicted by the US for allegedly working with COMAC to allegedly steal the secrets of thirteen foreign aerospace companies working on the C919.[51]

By the end of 2018, the first prototype was to enter flutter flight tests after having completed ground tests.[52] The third prototype made its maiden flight on 28 December for 1h 38 min.[53]

2019[edit]

A fourth prototype conducted its maiden flight on 1 August 2019 from Shanghai Pudong International Airport.[54][33] A fifth prototype conducted its first flight on 24 October 2019, also from Shanghai airport; the fifth prototype was expected to test for extreme weather conditions, the environmental control system, drainage systems and electrical supplies.[55] Comac rescheduled its certification target from 2020 to 2021, with the first delivery the following year.[56][33]

The sixth and final prototype, intended for the flight certification program, completed its maiden flight on 27 December 2019. Reports at the time indicated that the C919 was expected to commence commercial service with China Eastern Airlines in either 2021 or 2022.[57]

2020[edit]

Air display at Nanchang in 2020 (0:50–1:50)

On 27 November 2020, the C919 received its type inspection authorization from the CAAC, meaning that "the aircraft design has been finalised and verified, and that no major changes can be made to its structure."[58] COMAC hoped to proceed with more intensive flight tests to certify airworthiness by 2021 and to commence deliveries.[citation needed]

2021[edit]

After completing cold-weather testing in China's Inner Mongolia, the C919 is slated to conduct flight tests in natural icing conditions from London International Airport in Ontario, Canada during March 2021. However, these tests may be delayed depending on the progression of the COVID-19 pandemic.[59][needs update]

2022[edit]

China Eastern Airlines' first C919 (registration B-919A) on a validation flight at Beijing Capital International Airport in December 2022

The C919 completed its first pre-delivery flight test at Shanghai Pudong International Airport. Comac reports that the aircraft (B-001J, MSN107) successfully completed a 3-hour test session on 14 May 2022.[60] The aircraft bearing the livery of China Eastern Airlines, was set to be delivered in 2022.[61] In May 2022, the heavily modified jet was listed for a price of 653 million yuan (US$101 million), almost matching the Airbus A320neo and the Boeing 737 MAX competitors, and twice the US$50 million price initially anticipated, albeit with composite wings.[62]

The airline flew a number of route-proving flights throughout 2022 to reinforce its viability on important segments. Many of the flights were flown between different Chinese cities. Around the same time, the first production aircraft, bound for China Eastern Airlines, started performing flight tests to ensure its preparation for commercial service. COMAC reported after the first flight that all pre-set tasks were accomplished successfully.[63][64] It is forecasted that one C919 is to be delivered to China Eastern Airlines in 2022,[needs update] while the remaining four aircraft in the first batch of orders will be delivered in 2023.[65]

The aircraft received its airworthiness certification from the Civil Aviation Administration of China on 29 September 2022[66] and the first operational airframe intended for commercial service was delivered to launch customer China Eastern Airlines on 9 December 2022 in Shanghai.[67] The aircraft is expected to enter into regular service in spring 2023.[68]

2023[edit]

The first C919 commercial flight departed from Shanghai Hongqiao Airport on 28 May 2023

The C919 aircraft delivered to China Eastern Airlines continued flying short test flights for most of January 2023, with a break from 20 to 28 January for the Lunar New Year celebrations.[69] In February 2023, China Eastern Airlines' C919 flight-test verification program was delayed due to a malfunction in the jet's CFM International LEAP-1C engine's thrust reverser.[70] On 7 May 2023, test flights resumed after a three-month break that had grounded the entire fleet of C919s; the airline continued to plan for passenger revenue-service to commence in spring 2023.[70]

On 28 May 2023, COMAC C919 commercial service began with China Eastern Airlines flight MU9191 departing from Shanghai Hongqiao Airport and arriving at Beijing Capital Airport.[2]

Design[edit]

Configuration and performance[edit]

The dimensions of the C919 are quite similar to those of the Airbus A320; its fuselage is 3.96 metres (13.0 ft) wide and 4.166 metres (13.67 ft) high with a 12.915 square metres (139.02 sq ft) cross-section. This may allow for a common unit load device to be used for both aircraft. It has a 33.6 metres (110 ft) wingspan (35.4 metres (116 ft) with winglets).[71] The aircraft's intended payload capacity will be 20.4 tonnes. The design calls for cruise at Mach 0.785 (450 kn; 834 km/h) with an operating ceiling of 12,200 metres (39,800 feet). There will be two variants: the standard version with a 4,075 km (2,200 nmi) range, and a 5,555 km (2,999 nmi) extended-range version.[71] The C919 is a conservative design, deemed by analysts to be similar to the 30 years older A320[42] and less efficient than the A320neo and 737 MAX.[72]

Construction[edit]

The center wing box, outer wing box, wing panels, flaps, and ailerons are planned to be built in Xi'an, China; the center fuselage sections are planned to be built in Hongdu, China.[73] Aluminium-lithium alloys account for 8.8% of the structure and composite materials for 12%.[74] The air frame will be made largely of aluminium alloy. Aircraft design and assembly is performed in Shanghai.[citation needed]

Wings[edit]

The wing is of a supercritical design, increasing aerodynamic efficiency by 20% and reducing drag by 8% compared to a non-supercritical wing.[75] The center wing box was originally intended to use carbon fibre composites.[9] It was changed later to an aluminium design to reduce design complications.[76]

Systems[edit]

The engine's nacelle, thrust reverser and exhaust system will be provided by Nexcelle, with such features as an advanced inlet configuration, the extensive use of composites and acoustic treatment and an electrically operated thrust reverser.[77] Michelin will supply Air X radial tyres.[78] Its integrated modular avionics architecture is based on Ethernet.[42] The landing gear is made in China by a joint venture of Germany's Liebherr and Avic's Landing Gear Advanced Manufacturing Corp: Liebherr LAMC Aviation.[48]

While the airframe is entirely made by Chinese Avic, some systems are made by joint-ventures with foreign companies located within China: with UTAS for the electric power, fire protection and lighting; with Rockwell Collins for the cabin systems and avionics, with Thales for the IFE, with Honeywell for the flight controls, APU, wheels and brakes; with Moog for the high lift system; with Parker for the hydraulics, actuators and fuel systems, with Liebherr for the landing gear and air management; and the CFM engine and Nexcelle nacelle are entirely foreign.[79]

Engines[edit]

CFM International LEAP-1C[edit]

CFM International LEAP mockup

Pratt & Whitney and CFM International each offered an engine for the aircraft in 2009, the PW1000G and the LEAP-1C, respectively;[80] the LEAP-1C was selected.[81]

In February 2020, Reuters reported that the US government was considering blocking GE from selling the LEAP-1C engine to Comac, citing concerns of reverse engineering, competition for Boeing, and military use of technology.[82] Then-President Donald Trump tweeted opposition, saying that national security should not be grounds for trade restrictions.[83] The US eventually granted GE a license to sell the engines in April 2020.[84]

ACAE CJ-1000A[edit]

AVIC Commercial Aircraft Engine Co was tasked with developing an indigenous engine for the aircraft in 2009.[85] The ACAE CJ-1000A was unveiled at the 2012 Zhuhai Airshow.[citation needed]

Assembly of the first CJ-1000AX engine was completed in 18 months in December 2017. The planned entry into service was 2021.[86] The engine first ran in May 2018 to 6,600 rpm core speed.[87]

In March 2023, reports emerged that the flight test campaign for the CJ-1000A engine had started on a Xi'an Y-20 test aircraft.[88]

Market[edit]

In 2012 the C919 order book stood at 380 units worth US$26 billion,[89] and averaging $68.4 million. FlightGlobal's Ascend market values in 2013 were $49.2 million for the Airbus A320neo, 51% less than its $100.2 million list price and $51.4 million for the Boeing 737 MAX-8, 49% less than its $100.5 million list price.[90]

The Chinese airlines that have placed orders for the C919 already have either the Boeing 737 or Airbus A320 in their fleets.[91] In 2013, Chinese state-owned newspaper Global Times complained that an Aviation Week editorial about the bleak prospects for the aircraft "maliciously disparaged the future outlook for the C919".[92]

COMAC aims to take a fifth of the global narrowbody market and a third of the Chinese market by 2035.[7] It expects 2,000 sales in the next 20 years.[93] The Financial Times commented that China considers it as a source of national pride.[94] It also claimed the C919 is outdated by 10–15 years compared to the latest versions of the A320 and Boeing 737, and will probably cost more to operate.[95] Its range of 2,200–3,000 nmi (4,100–5,600 km) falls short of the 3,400 and 3,550 nmi (6,300 and 6,570 km) of the A320neo and 737 Max 8, the C919 payload-range and economics are similar to the current single-aisles, but it will compete with the Neo and Max. FlightGlobal forecasts 1,209 deliveries: 687 standard and 522 stretched variants, for 85% in China.[36]

Orders[edit]

At the November 2010 Zhuhai Airshow, Comac announced orders for 55 C919 aircraft from six airlines, with an additional 45 options. The purchasing airlines or lessors included China Eastern Airlines, Air China, Hainan Airlines, China Southern Airlines, CDB Leasing Company, and GE Capital Aviation Services.[96] On 19 October 2011, Chinese ICBC Leasing ordered 45 C919s and agreed to be the launch customer.[97] On 11 November 2014, Comac announced at the 2014 Zhuhai Airshow that China Merchants Bank's aircraft leasing division made a firm commitment for 30 C919s, and that total orders were now up to 450 aircraft.[98]

At the June 2015 Paris Air Show, Ping An Leasing signed a letter of intent for 50 C919s, becoming one of Comac's largest customers, and Puren Group signed a letter of intent for seven C919s and seven ARJ21s, intended for the start-up Puren Airlines.[99] In November 2016 COMAC has received an order for 20 C919s including 5 firm from Shanghai Pudong Development Bank Financial Leasing and for 36 C919s from CITIC Group Financial Leasing including 18 firm.[100] While no down payments were needed before its maiden flight, 500,000 yuan ($76,000) were deposited subsequently for each firm order.[101] The 5 December 2017 ICBC Leasing order for 55 brought the order book to 785.[102] In February 2018, its total order book was for 815, before the order for 200 from HNA Group in June 2018, along with 100 ARJ-21s.[103] By August 2018, FlightGlobal counted 305 orders plus 45 options and 658 letters of intent: 1008 commitments.[36]

The first commercial airframe was delivered to China Eastern Airlines on 9 December 2022.[67] By January 2023, COMAC reported having received more than 1,200 orders and aimed to expand its annual production capacity to 150 airliners in five years.[104]

Orderbook[105]
Customer Orders Options
ABC Financial Leasing 65 10
AerCap 20
Air China 5 15
AVIC International Leasing 15 15
Bank of Communications Financial Leasing 30
BOC Aviation 20
CCB Financial Leasing 50
CDB Leasing 10
China Aircraft Leasing Co. 20
China Eastern Airlines 5 15
China Huarong Financial Leasing 30
China Southern Airlines 5 15
Citic Financial Leasing 18
Hainan Airlines 20
Hebei Airlines 20
Huabao Leasing 15 15
ICBC Financial Leasing 100
Industrial Bank 20
Joy Air 20
Nuclear Construction Financial Leasing 20 20
Ping An Leasing 50
Sichuan Airlines 20
SPDB Financial Leasing 5 15
Total 583 120

Deliveries[edit]

The first operational C919 airframe intended for commercial service was delivered to China Eastern Airlines on 9 December 2022.[67]

Deliveries[4][unreliable source?][106][unreliable source?]
Airline 2022
China Eastern Airlines 1
Total 1

Cancelled[edit]

Orders
Customer Firm
orders
Options
LOI/MOU
All Date
Puren Group[107] 7 7 17 June 2015
City Airways[a][109] 10 (MOU) 10 16 September 2015

Specifications (C919ER)[edit]

C919 Aircraft Characteristics for Airport Planning[110]
Cockpit crew 2
Seats 158 (2-class) to 174 (1-class HD)
Length 38.9 m (127 ft 7 in)
Wingspan 35.8 m (117 ft 5 in)
Wing area 129.15 m2 (1,390.2 sq ft)
Height 11.95 m (39 ft 2 in)
Fuselage height 4.166 m (13 ft 8.0 in)
Fuselage width 3.96 m (13 ft 0 in)
Maximum payload 18,900 kg (41,700 lb)
OEW 45,700 kg (100,800 lb)
MTOW 78,900 kg (173,900 lb)
Fuel capacity 24,917 L (6,582 US gal)
Engines (×2) CFM LEAP-1C
TO/GA Thrust (×2) 137.14 kN (30,830 lbf)[111]
Cruise Mach 0.785[112][better source needed]
Range 5,576 km (3,011 nmi)[b]
Ceiling 12,100 m (39,700 ft)[112]
Takeoff (MTOW, ISA) 2,125 m (6,972 ft)
Landing (MLW, ISA, Dry) 1,778 m (5,833 ft)

See also[edit]

Related development

Aircraft of comparable role, configuration, and era

Related lists

Notes[edit]

  1. ^ City Airways orders looks doubtful as it was shut down in early 2016 by the Thai government[108]
  2. ^ 15,010 kg (33,090 lb) payload, max payload: 3,922 km (2,118 nmi)

References[edit]

  1. ^ a b Greg Waldron (5 May 2017). "Comac C919 lands after uneventful maiden sortie". Flight Global. Archived from the original on 5 September 2017. Retrieved 5 May 2017.
  2. ^ a b "China's C919 Takes Maiden Commercial Flight-and First Bite From Boeing". The Wall Street Journal. 28 May 2023. Retrieved 28 May 2023.
  3. ^ "東航砸重金買28架國產飛機 C919客機身價曝光". chinatimes. 11 May 2022. Retrieved 7 January 2023.
  4. ^ a b "COMAC C919 production list". rzjets.net. Retrieved 20 November 2022.
  5. ^ Jie, Liu; Zhongxi, Qi; Tao, Hu (5 May 2017). "China Focus: China's homegrown jumbo passenger jet takes to the sky". Xinhua. Archived from the original on 5 May 2017. Retrieved 7 May 2017.
  6. ^ "China-made C919 to compete with Airbus, Boeing". Shanghai Daily. 8 March 2009. Retrieved 10 June 2017.
  7. ^ a b Katie Cantle (5 May 2017). "COMAC launches C919 inaugural flight". Air Transport World. Aviation Week. Archived from the original on 15 June 2017. Retrieved 5 May 2017.
  8. ^ "Zhuhai10: COMAC releases C919 specifications". Flight Global. 16 November 2010. Archived from the original on 4 December 2016. Retrieved 5 May 2017.
  9. ^ a b Richard Aboulafia (2010). Comac C919 Program Briefing (PDF). World Military & Civil Aircraft Briefing (Report). pp. 78–81. Archived from the original on June 2011.
  10. ^ "Ryanair and COMAC Sign C919 MOU in Paris" (Press release). Ryanair. 12 December 2013. Archived from the original on 12 December 2018. Retrieved 5 May 2017.
  11. ^ "Airbus to Seek Alliances as Rivals Try to Sell Big Planes". Bloomberg. 14 February 2012. Archived from the original on 29 September 2018. Retrieved 3 May 2017.
  12. ^ "C919 project at "crucial point" in detailed design". Flight Global. 25 November 2011. Archived from the original on 20 April 2017. Retrieved 19 April 2017.
  13. ^ "COMAC begins pilot production of C919 jet". People's Daily Online. 16 December 2011. Archived from the original on 23 September 2013. Retrieved 22 December 2011.
  14. ^ "China's Tianhe-2 retains supercomputer crown". Xinhua. 23 June 2014. Archived from the original on 29 June 2014.
  15. ^ Agence France-Presse (19 November 2012). "China's COMAC Collects 50 More Orders for Home-grown C919 Airplane". Industry Week. Archived from the original on 8 February 2013. Retrieved 12 February 2013.
  16. ^ Mavis Toh (4 December 2013). "Comac and Bombardier discuss next phase of collaboration". Flight Global. Archived from the original on 20 August 2017. Retrieved 7 May 2017.
  17. ^ Perrett, Bradley (16 December 2013). "C919 May Be Largely Limited To Chinese Market". Aviation Week & Space Technology. Archived from the original on 20 April 2017. Retrieved 19 April 2017.
  18. ^ "China's C919 large airplane schedule to take first flight in 2015". People's Daily Online. 18 February 2014. Archived from the original on 2 March 2014. Retrieved 24 March 2014.
  19. ^ Ren, Daniel (22 May 2014). "China's first large airliner delayed by technology problems". South China Morning Post. Archived from the original on 25 May 2014. Retrieved 26 May 2014.
  20. ^ "China Planemaker Gets New Orders in Fight With Airbus, Boeing". Bloomberg. 11 November 2014. Archived from the original on 11 November 2014. Retrieved 6 March 2017.
  21. ^ "China's Comac rolls out C919 jet, ground tests to start soon". Reuters. 1 November 2015. Archived from the original on 5 November 2015. Retrieved 2 November 2015.
  22. ^ "China's Airbus: Country to roll out first indigenous passenger jet in Shanghai after 7-year wait". South China Morning Post. 2 November 2015. Retrieved 2 November 2015.
  23. ^ Jiang, Steven (2 November 2015). "China takes on Boeing, Airbus with homegrown passenger jet". CNN. Archived from the original on 2 November 2015. Retrieved 2 November 2015.
  24. ^ Mavis Toh (25 June 2018). "Comac completes static tests for composite wing project". Flightglobal. Archived from the original on 25 June 2018. Retrieved 25 June 2018.
  25. ^ a b Greg Waldron (13 July 2018). "PICTURES: C919 undergoes ultimate wing load test". Flightglobal. Archived from the original on 13 July 2018. Retrieved 24 July 2018.
  26. ^ a b Cimpanu, Catalin. "Building China's Comac C919 airplane involved a lot of hacking, report says". www.zdnet.com. ZDNet. Archived from the original on 15 November 2019. Retrieved 12 January 2020.
  27. ^ a b Paganini, Pierluigi (18 October 2019). "China-linked cyberspies Turbine PANDA targeted aerospace firms for years". securityaffairs.co. Security Affairs. Archived from the original on 12 January 2020. Retrieved 12 January 2020.
  28. ^ a b "Indictment". 25 October 2018. Archived from the original on 1 November 2018.
  29. ^ a b c Vijayan, Jai (14 October 2019). "Cyber Theft, Humint Helped China Cut Corners on Passenger Jet – Beijing likely saved a lot of time and billions of dollars by copying components for its C919 plane from others, a new report from CrowdStrike says". DarkReading. InformationWeek. The human intelligence efforts included one by a now-indicted MSS intelligence officer to recruit an insider at LEAP-X manufacturer General Electric. The same officer also recruited a China-born US Army reservist who was an expert at assessing turbine engine schematics. So far, at least four individuals have been arrested in connection with China's campaign targeting aerospace companies.
  30. ^ "Chinese Spy Gets 20 Years for Aviation Espionage Plot". 17 November 2022.
  31. ^ Katie Cantle (25 April 2017). "COMAC C919 completes high-speed taxi tests; cleared for first flight". Air Transport World. Aviation Week. Archived from the original on 25 April 2017. Retrieved 25 April 2017.
  32. ^ "China's first big passenger plane takes off for maiden flight". BBC News. 5 May 2017. Archived from the original on 5 May 2017. Retrieved 5 May 2017.
  33. ^ a b c "Latest C919 Prototype Completes Maiden Flight". Airliner World. October 2019: 17.
  34. ^ Bradley Perrett (18 May 2017). "Source: COMAC C919 targets first delivery for 2020". Air Transport World. Aviation Week Network. Archived from the original on 18 May 2017. Retrieved 18 May 2017.
  35. ^ "Civil Aviation Programs To Watch". Aviation Week & Space Technology. 9 June 2017.
  36. ^ a b c Firdaus Hashim (26 October 2018). "Comac marches forward with ARJ21 and C919". Flightglobal. Archived from the original on 28 October 2018. Retrieved 28 October 2018.
  37. ^ Mavis Toh (31 July 2017). "Comac achieves power-on for second C919 prototype". Flightglobal. Archived from the original on 31 July 2017. Retrieved 31 July 2017.
  38. ^ Greg Waldron (28 September 2017). "Comac C919 completes two-hour second flight". Flightglobal. Archived from the original on 28 September 2017. Retrieved 28 September 2017.
  39. ^ Bradley Perrett (19 September 2017). "Second Comac C919 Flight Imminent, Five Months After First Flight". Aviation Week. Archived from the original on 23 September 2017. Retrieved 23 September 2017.
  40. ^ Mavis Toh (3 November 2017). "C919 takes third flight; engines start up on FTA 2". Flightglobal. Archived from the original on 3 November 2017. Retrieved 3 November 2017.
  41. ^ Mavis Toh (10 November 2017). "Comac transfers C919 to Xian for flight tests". Flightglobal. Archived from the original on 10 November 2017. Retrieved 10 November 2017.
  42. ^ a b c Bjorn Fehrm (3 January 2018). "United Aircraft's and COMAC's eventful year". Leeham. Archived from the original on 2 March 2019. Retrieved 3 January 2018.
  43. ^ Brenda Goh (5 February 2018). "China's COMAC says first delivery of C919 jet planned for 2021". Reuters. Archived from the original on 6 February 2018. Retrieved 6 February 2018.
  44. ^ Bradley Perrett (6 February 2018). "Comac Aiming At 2021 For C919 First Delivery". Aviation Week Network. Archived from the original on 11 February 2018. Retrieved 11 February 2018.
  45. ^ Bradley Perrett (15 June 2018). "Comac Suspends C919 Flight Testing For Modifications". Aviation Week Network. Archived from the original on 20 June 2018. Retrieved 22 June 2018.
  46. ^ "COMAC suspends the flight tests for C919". AirlinerWatch. 18 June 2018. Archived from the original on 9 August 2018. Retrieved 22 June 2018.
  47. ^ Mavis Toh (22 June 2018). "Comac stresses progress as C919 prototypes fly". Flightglobal. Archived from the original on 14 April 2019. Retrieved 22 June 2018.
  48. ^ a b Bradley Perrett (26 September 2018). "Third Comac C919 Flight Test Aircraft To Fly This Year". Aviation Week Network. Archived from the original on 10 October 2018. Retrieved 7 October 2018.
  49. ^ Jennifer Meszaros (17 October 2018). "Comac C919 Stumbles on FAA Flight Deck Standards". AIN online. Archived from the original on 10 December 2018. Retrieved 18 October 2018.
  50. ^ Bradley Perrett (20 November 2018). "Comac C919 Testing Needs To Accelerate". Aviation Week & Space Technology. Archived from the original on 9 January 2019. Retrieved 20 November 2018.
  51. ^ Ferry, Jeff. "How China Stole an Entire Airplane". www.industryweek.com. Industry Week. Archived from the original on 17 December 2019. Retrieved 12 January 2020.
  52. ^ Greg Waldron (18 December 2018). "Comac gears up for C919 flutter tests". Flightglobal. Archived from the original on 18 December 2018. Retrieved 18 December 2018.
  53. ^ Greg Waldron (28 December 2018). "Third C919 prototype operates first flight". Flightglobal. Archived from the original on 29 December 2018. Retrieved 28 December 2018.
  54. ^ Chua, Alfred (1 August 2019). "Fourth C919 prototype completes test flight". Flightglobal. Archived from the original on 1 August 2019. Retrieved 1 August 2019.
  55. ^ Chua, Alfred (24 October 2019). "Fifth C919 prototype completes test flight". Flightglobal. Archived from the original on 30 October 2019. Retrieved 30 October 2019.
  56. ^ Bradley Perrett (26 August 2019). "Comac C919 Delivery May Be Three Years Away". Aviation Week & Space Technology.
  57. ^ Greg Waldron (27 December 2019). "C919 test fleet complete with flight of sixth prototype". Flight Global. Archived from the original on 27 December 2019. Retrieved 27 December 2019.
  58. ^ Alfred Chua (27 November 2020). "Comac C919 enters final flight test stage". Flight Global.
  59. ^ Alfred Chua (8 February 2021). "C919 heads to Canada for cold-weather icing tests". Flightglobal.
  60. ^ "Chinese rival to B737 and A320 jets completes Shanghai flight test". South China Morning Post. 14 May 2022. Retrieved 14 May 2022.
  61. ^ "First C919 jet to be delivered completes successful maiden test flight". Xinhua. 14 May 2022.
  62. ^ Rong, Huang; Yi, Ding (12 May 2022). "China-Developed C919 Jet to Cost Twice the Expected Price, Filing Shows". Cai Xin Global – via The Straits Times.
  63. ^ "China's COMAC C919 Performing Route Proving Flights Across China". Smart Aviation Asia-Pacific. Retrieved 13 July 2022.
  64. ^ "COMAC Flies 1st C919 Bound For An Airline Customer". Simple Flying. 15 May 2022. Retrieved 13 July 2022.
  65. ^ "China Eastern sees smaller-than-expected C919 delivery this year". Reuters. 1 September 2022. Retrieved 11 October 2022.
  66. ^ "China certifies COMAC C919, five years after first flight". Aviation Week. 29 September 2022.
  67. ^ a b c "China Eastern takes delivery of the world's first made-in-China C919 jet". Reuters. 9 December 2022.
  68. ^ Charlotte Seet (30 January 2023). "COMAC C919 First Flight Of Lunar New Year, Targets 150 Aircraft Per Year". Simple Flying. Retrieved 7 February 2023.
  69. ^ Seet, Charlotte (30 January 2023). "COMAC C919 First Flight Of Lunar New Year, Targets 150 Aircraft Per Year". Simple Flying. Retrieved 3 May 2023.
  70. ^ a b "The COMAC C919 Flies For The 1st Time In 3 Months". Simple Flying. 7 May 2023. Retrieved 25 May 2023.
  71. ^ a b Bradley Perrett (8 September 2009). "Comac Begins Building C919 Structure". Aviation Week. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  72. ^ Venckunas, Valius (10 November 2020). "COMAC C919: how to break Airbus-Boeing duopoly - AeroTime".
  73. ^ "COMAC C919 – program supplier guide". Airframer Limited. Stansted News. 24 March 2017. Archived from the original on 7 June 2017. Retrieved 19 August 2011.
  74. ^ "COMAC Rolls Out First C919 in Shanghai" (Press release). Comac. 2 November 2015. Archived from the original on 17 May 2016. Retrieved 5 May 2017.
  75. ^ An Xinzhu (6 April 2017). "Jumbo Jet Collaborative Innovation". China Today. Archived from the original on 2 October 2017. Retrieved 5 May 2017.
  76. ^ Mavis Toh (4 July 2014). "Xian Aircraft rolls out first C919 center wing box". Flight Global. Archived from the original on 16 February 2016. Retrieved 12 February 2016.
  77. ^ "High Tech Nacelle for C919 Said To Be World First". Aviation Daily. Aviation Week. 5 February 2010. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  78. ^ "Michelin to supply tyres for China's first commercial airliner" (Press release). Michelin. 12 April 2011. Archived from the original on 21 April 2017.
  79. ^ Perrett, Bradley; Bruno, Michael (18 October 2018). "Technology For Access To China? Maybe Not". Aviation Week & Space Technology.
  80. ^ "Pratt offers geared turbofan for China's C919 airliner". Flight Global. 5 October 2009. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  81. ^ David Kaminski-Morrow (21 December 2009). "CFM to build LEAP-X engine in China after C919 deal". Flight Global. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  82. ^ Freifeld, Karen; Alper, Alexandra (16 February 2020). "U.S. weighs blocking GE engine sales for China's new airplane: sources". Reuters.
  83. ^ Mason, Jeff; Brice, Makini (18 February 2020). "Trump blasts proposed U.S. restrictions on sale of jet parts to China". Reuters. Retrieved 2 July 2020.
  84. ^ Qiu, Stella; Freifeld, Karen (7 April 2020). "Exclusive: U.S. grants GE license to sell engines for China's new airplane". Reuters. Retrieved 2 July 2020.
  85. ^ "C919 set to fly with imported engines initially". Shanghai Daily. 4 November 2011. Archived from the original on 20 April 2017. Retrieved 20 April 2017.
  86. ^ Stephen Trimble (29 December 2017). "China completes assembly of first high-bypass turbofan engine". Flightglobal. Archived from the original on 2 February 2018. Retrieved 19 May 2018.
  87. ^ Mavis Toh (18 May 2018). "C919's local engine alternative powered up". Flight Global. Archived from the original on 2 May 2019. Retrieved 18 May 2018.
  88. ^ Ostrower, Jon (24 March 2023). "As congress debates TikTok, China flies its own commercial jet engine". The Air Current.
  89. ^ Yu Dawei and Liang Dongmei (18 December 2012). "Comac C919 Airliner Project Flying in the Dark". Caixin Online. China Aviation Daily. Archived from the original on 29 September 2018. Retrieved 5 May 2017.
  90. ^ Vincent Lamigeon (13 June 2013). "Le vrai prix des avions d'Airbus et de Boeing" (in French). Challenges.fr. Archived from the original on 9 April 2015.
  91. ^ "COMAC C919, against Airbus and Boeing duopoly". Airlineberg. 19 May 2012. Archived from the original on 12 November 2012.
  92. ^ Joe Anselmo (18 July 2013). "China Newspaper Slams Aviation Week For 'Oppressive Scheme". Aviation Week. Archived from the original on 25 October 2016. Retrieved 5 May 2017.
  93. ^ "What C919 means to China jet industry and domestic airlines". EJ Insight. 5 May 2017. Archived from the original on 5 May 2017. Retrieved 6 May 2017.
  94. ^ "China's challenger to Airbus and Boeing set for skies at last". Financial Times. 29 April 2017. Archived from the original on 1 May 2017. Retrieved 6 May 2017..
  95. ^ Ben Bland (17 May 2017). "Chinese aviation finally takes off with help from the west". Financial Times. Archived from the original on 10 July 2017. Retrieved 27 June 2017.
  96. ^ Bradley Perret (16 November 2010). "Hainan, Gecas To Be Among First Customers For C919". Aviation Week. Alt URL
  97. ^ "ICBC Financial Leasing Co., Ltd. signs the agreement of 45 C919 orders with COMAC" (Press release). 19 October 2011. Archived from the original on 5 March 2016. Retrieved 20 April 2017.
  98. ^ Katie Cantle (12 November 2014). "COMAC wins more orders for C919, ARJ21". Air Transport World. Aviation Week. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  99. ^ "Comac wins commitments for 64 jets". Flight Global. 15 June 2015. Archived from the original on 17 June 2015. Retrieved 14 August 2015.
  100. ^ Toh, Mavis (1 November 2016). "Comac wins lessors' orders for 23 C919s". Flight Global. Archived from the original on 21 April 2017. Retrieved 20 April 2017.
  101. ^ Brenda Goh (19 September 2017). "China's COMAC says signs 130 orders for C919 passenger jet". reuters. Archived from the original on 23 September 2017.
  102. ^ "China's ICBC Financial Leasing orders 55 C919 planes". Reuters. 5 December 2017. Archived from the original on 7 December 2017.
  103. ^ "China's HNA, COMAC sign deal for 200 C919, 100 ARJ21 jets Reuters". Reuters. 2 June 2018. Archived from the original on 2 June 2018. Retrieved 4 June 2018.
  104. ^ "China expects annual production capacity of C919 planes to reach 150 in 5 years". Reuters. 12 January 2023.
  105. ^ Chen Chuanren, Jens Flottau (11 October 2022). "Comac C919 Certified As Arrival of Revamped MC-21 Shifts To 2024". Aviation week & space technology.{{cite news}}: CS1 maint: uses authors parameter (link), printed: "Past the golden age". 24 October 2022. p. 15. {{cite magazine}}: Cite magazine requires |magazine= (help)
  106. ^ "COMAC C919 production list". planespotters.net. Retrieved 24 November 2022.
  107. ^ "Lübeck, Germany files for insolvency – again". ch-aviation. 6 October 2015. Archived from the original on 19 October 2015. Retrieved 5 May 2017.
  108. ^ Mavis Toh (12 June 2017). "Long march ahead for China airliner exports". Flight Global. Archived from the original on 12 June 2017. Retrieved 12 June 2017.
  109. ^ Toh, Mavis (16 September 2015). "Thailand's City Airways signs for 10 C919s, 10 ARJ21s". Flight Global. Archived from the original on 2 February 2017. Retrieved 20 April 2017.
  110. ^ COMAC. "C919 Aircraft Characteristics for Airport Planning" (PDF).
  111. ^ "EASA.E.110 – LEAP-1A & LEAP-1C series engines". EASA. Retrieved 18 October 2022.
  112. ^ a b "C919客机即将面世,它的魅力在哪?全面解读C919!--科普中国--人民网". kpzg.people.com.cn. Retrieved 18 October 2022.

External links[edit]